Sunday, August 7, 2011

Monet's Lily Pond Kimono

I finished my Monet Lily Pond Kimono, but not without a few problems; it just didn't want to be done. Whenever I thought I was through, I found something that needed to be changed, and when I changed that, something else would not be right. I did the bottom of the back 3 times before I got it right, partly because I ran low on the medium green yarn I needed. It was where it was to be seamed to the front, which would really point out the difference. But I did find a good substitute, and got it done.

I originally wanted a short, little kimono, to fit the way it does in Jane Thornley’s Guide. And it started out that way, but it stretched as I worked on it, and ended up full size; as you can see in the photo.  I guess the shorter kimono will have to be another project. Anyway, it’s done. It's ridiculous that it took me so long; I was the first to start mine for the Knit A Masterpiece KAL, but far from the first to finish.


I also finished my Breeze Wrap, but that's a long story to be covered in another post.

No comments :

Post a Comment

Thanks for visiting; please leave a comment, favorable or not. I'd love to hear your thoughts. That's how we learn and grow; and how we know someone out there is paying attention.

Have a wonderful day; see you all next time.